We successfully completed the lining of a 60m × 46m dam in Allay-baday in collaboration with Manhal Charitable Society.
This project was generously funded by Qatar Charity and aimed at improving water storage efficiency for the local community.

Scope of Work:
• Installation of HDPE geomembrane lining
• Surface preparation and installation works
• Quality assurance and site execution
This initiative significantly reduces water seepage and enhances long-term water conservation.
We are proud to contribute to sustainable water infrastructure that directly impacts communities.
#WaterManagement #Geomembrane #Sustainability #Engineering #Somaliland
